Compliance updateApproved Document B
The guidance changes. The compartmentation still has to hold.
From 30 September 2026, updated Approved Document B guidance for England introduces new measures that buy time. Each assumes the compartmentation is still intact when it is needed. This page sets out what changes, what does not, what your test evidence needs to look like by 2029, how to close the façade cavity in buildings above and below 18 metres, and where to get the documents.
When compliance is challenged, you need evidence you can stand behind.
Tenmat manufactures its own intumescent materials and tests cavity barriers within representative construction build-ups, providing a single source of accountability from material production through to the finished product. Alternative cavity barrier systems assembled from third-party components can rely on multiple suppliers, creating a fragmented chain of responsibility.
With Tenmat, one manufacturer stands behind the entire solution, supported by openly available test and assessment evidence that can support multiple projects within its scope of application.
What changed on 30 September 2026 and what didn't.
New residential buildings containing flats with a storey 18 metres or more above ground level should now be provided with more than one common stair. The same amendment also introduces design provisions for evacuation lifts where they are provided.
Schemes already notified to building control before that date can continue under the previous guidance, provided the work meets the applicable sufficiently progressed criteria within the 18-month transitional period. For schemes close to the transition boundary, confirm which guidance applies as early as possible.
The amendment follows the March 2025 changes, which introduced sprinklers in all new care homes regardless of height, together with compartment size limits and associated fire safety provisions. In doing so, the guidance recognised that building height alone is not always the best indicator of fire risk or evacuation complexity.
What has not changed is the continued need to control hidden fire spread within external wall cavities. Cavity barriers remain a long-established requirement in many forms of construction, including buildings well below 18 metres in height, where they are used to close concealed spaces and maintain the effectiveness of compartmentation. However, for many lower-rise buildings, the extent and arrangement of cavity barriers within ventilated façade systems continue to depend on the specific wall construction and fire strategy adopted for the project.
One amendment programme, delivered over five years.
-
Sprinklers required in all new care homes, regardless of height. National classifications for reaction to fire and roof performance withdrawn from Approved Document B.
-
New residential buildings containing flats with a storey 18 metres or more above ground level should be provided with more than one common stair. The amendment also introduces provisions for evacuation lifts where they are provided.
-
References to BS 476 fire resistance classifications are removed from Approved Document B. The BS EN 13501 classification system and relevant EN test standards become the sole route referenced in the guidance for demonstrating fire resistance performance, subject to applicable transitional provisions.
Will your evidence still count in 2029?
BS 476 fire resistance classifications leave Approved Document B on 2 September 2029. After that date, the BS EN 13501 classification system and relevant EN test standards become the sole route referenced in the guidance for demonstrating fire resistance performance. A product specified today using only BS 476 fire resistance evidence may require additional evidence before then, and any fire safety information handed over under Regulation 38 will need to reflect the applicable compliance route.
For a specifier, that creates risk. Where products are replaced because supporting evidence no longer aligns with the project requirements, the change must be assessed, reviewed and documented. On higher-risk buildings, product changes may also form part of the wider change-control process, creating additional programme and approval implications.
Our socket box inserts are supported by a BS EN 13501-2 classification report, classified from EI30 to EI120, based on testing to BS EN 1366-3 in single and double-layer partition constructions, and backed by a Declaration of Performance. The evidence is already aligned with the classification system referenced by the 2029 guidance, reducing the need for future requalification or respecification.
- EI120
- Up to 120 minutes fire resistance in flexible partitions
- Up to 80%
- Faster to fit than putty pads. Push fit, no trimming, no sealant
- 67 dB
- Acoustic rating held, tested under UKAS conditions at BRE
- 35 / 47
- Box depths in mm, metal and plastic, back-to-back tested
What it means for the job: a fire-rated wall is only as good as its weakest opening, and every socket box penetration is a potential weak point. An insert fitted in seconds reduces labour on every partition, while a pre-formed solution provides a visible, repeatable detail that can be checked on site and readily inspected when building control, a fire engineer or the principal contractor asks how fire performance is maintained at each socket location.
Cavity barriers
Close the cavity, whatever the height.
Progressive horizontal evacuation works by moving residents through a fire-resisting wall into an adjoining compartment and keeping them safe there. It buys time, provided the compartmentation strategy remains effective. Concealed cavities within the external wall can provide a route for fire and smoke to bypass compartment walls and floors, which is why cavity barriers remain a fundamental fire safety measure in buildings of all heights.
Our open-state ventilated cavity fire barriers are designed to close that route in the event of fire while allowing the façade cavity to drain and ventilate during normal service. The VFB 120/120 maintains a 25mm ventilation gap in everyday use and expands under fire conditions to seal the cavity against the passage of fire and smoke.
The VFB 120/120 is third-party certified by IFC Certification (certificate IFCC1751, field of application report PAR 22672 02), tested to the principles of BS EN 1363-1 and ASFP TGD 19, and CCPI verified. Non-ventilated NVFB barriers in A1 stone wool provide compartment-line closure alongside ventilated barrier locations.
Key performance · VFB 120/120
- EI120
- 120 minutes integrity and insulation in cavities up to 300mm, and 90 minutes in cavities up to 450mm
- 25mm
- Ventilation gap maintained in normal service for drainage and airflow
- 60 years
- Working life, supported by durability and ageing assessments
Where the fire strategy relies on compartmentation, concealed cavities should not be allowed to undermine it, regardless of building height.
What it means for the specification
Below 18 metres, the question is often not whether cavity barriers are needed, but how the compartmentation strategy is maintained within the external wall. In a care home, extra care scheme, or any building where residents may remain in place while others are evacuated, that detail can be fundamental to the fire strategy. Specifying a cavity barrier backed by third-party certification and a field of application report provides a robust evidence trail for approval bodies and helps protect the design intent from later value engineering.
From the F LabTenmat fire testing facility, Irlam
The test evidence should be relevant to your proposed construction build-up.
Chris Thompson runs product management at Tenmat and spends a good part of his week in the F Lab, our fire testing facility at Irlam. We asked him what people get wrong about test evidence.
01 On process
“In reality, it’s a detailed process. We replicate real site conditions, which means liaising with multiple stakeholders and partner manufacturers and specifying, sourcing and installing multiple materials before the test build even begins. It’s more time-consuming and complex, but that’s what makes the results meaningful.”
02 On the facility
“It’s not just a lab, it’s a resource. We run project-specific and system-specific tests that help get Tenmat products specified on major builds in the UK, Europe, and the US. Our furnace can handle multiple international standards.”
03 What it means for your project
A test based on a representative wall build-up, whether for cavity barriers or service penetrations such as socket boxes, tells you more about how the product will perform in practice than evidence taken from a generic construction. It gives designers, contractors and approval bodies a clearer line of sight between the tested assembly and the building being delivered.
That clarity helps support Gateway 2 submissions, building control reviews and on-site compliance. It also makes compliant specifications harder to substitute because the evidence is tied to a defined construction detail rather than a broad product description.
Tenmat manufactures the intumescent material itself, so the material tested at F Lab is the material installed on site. The product, the test evidence and the installation method remain connected throughout the chain.
Our evidence promise
- We make it.
- We burn it.
- We test it.
One company from raw material supply through to supply on site.
Tenmat makes the material, tests products in relevant construction build-ups and stands behind the finished product, openly providing evidence for compliance.
Why the test evidence stands up.
Everything above comes back to one question: does the test evidence describe the product as it is actually installed?
Tenmat can answer that because it manufactures an extensive range of intumescent and non-intumescent materials used in its cavity fire barriers, socket box inserts and service penetration seals at Irlam, and tests those products in representative construction build-ups in the F Lab before third-party testing. The material tested is the material supplied, the classification relates to that material in that configuration, and the installation method is defined alongside the evidence.
That creates a direct line between the product specification, the test report and the installed product. For designers, contractors, building control and regulators, it provides a clear chain of evidence that can be followed from test data through to installation.
Where a Tenmat product incorporates other materials, such as the stone wool used within the cavity barrier range, Tenmat sources and converts those materials into the finished barrier system. The classification and supporting evidence apply to the finished product as supplied, rather than to the individual constituent materials in isolation.
The documents building control will ask for.
Datasheets, BIM objects and guidance in one place. Fire test evidence, safety data sheets and earlier versions of any document are available on request through the contact page.
Electrical penetrations
Cavity fire barriers
- VFB 120/120 (TDS 11)Datasheet · PDF
- IFC third-party certificate IFCC1751Certificate · PDF
- VFB 120/120 on NBS SourceSpecification · NBS Source
- VFB 60/60Datasheet · PDF
- VFB PlusDatasheet · PDF
- NVFB (TDS 34)Datasheet · PDF
- NVFB LD (TDS 35)Datasheet · PDF
- NVFB WB (TDS 21)Datasheet · PDF
- NVFB LGS linear gap sealsDatasheet · PDF
- CavGuard Roll 65 (TDS 39)Datasheet · PDF
- FF102/25Datasheet · PDF
- FF102/50Datasheet · PDF
- Cavity fire barriers for brick slip systemsDatasheet · PDF
- Brick slip cavity barrier systemProduct · Web
- The full cavity fire barrier rangeRange · Web
Guidance and reading
- The comprehensive guide to cavity fire barriersGuide · Web
- Retrofitting cavity barriers in existing buildingsArticle · Web
- Cavity barrier installation best practiceArticle · Web
- Care home fire safety: why 18 metres is the wrong lineArticle · Web
- Inside the F LabArticle · Web
- Technical HubLibrary · Web
Got questions on the new guidance or other queries on passive fire protection?
Is a transitional scheme still valid? Does a legacy BS 476 specification need updating? What will an inspector expect to see at a socket in a fire-rated wall? How should cavity barriers support compartmentation in buildings under and over 18 metres?
Ask us.
It does not have to involve a Tenmat product. Send the question to our technical team and we will provide an answer based on the guidance, the evidence and the practical realities of construction. Where the answer is likely to help others, we will publish it. Where it is project-specific or urgent, we will come back to you directly.
Understanding Passive Fire Protection
Our RIBA approved CPD covers how compartmentation works, where it typically fails and what the current guidance asks for. One hour, at your offices or at our Training Academy in Irlam.
Join the register
One issue a month, plus short bulletins written for your role.
Unsubscribe or change edition at any time. See our privacy policy.
You are in the register.